Vacant-flat renovation
Complete refurbishment at a change of tenant: walls, floors, bathroom, kitchen, minor repairs. Ready for acceptance on the agreed date.
Das Haus wird geladen
Vacant flat, bathroom or kitchen — all trades coordinated, with start and handover agreed in writing. You deal with your project manager, not with five companies.

Start and handover are set out in the contract. We flag delays before they happen.
Strip-out, plumbing, tiling, flooring and painting all run through your project manager — nothing gets lost between trades.
Fixed terms for recurring properties, with bundled invoicing per month or per property.
Acceptance report, before-and-after photos and a clear invoice, item by item.
More: Renovation and remodelling in Zurich and throughout Switzerland · Kitchen renovation in Zurich · Vacant flat renovation in Zurich
Complete bathroom renovation at a fixed price: Zurich · Winterthur · Zug · Lucerne
What we take on in complete renovation — on its own or as part of a complete package.
Complete refurbishment at a change of tenant: walls, floors, bathroom, kitchen, minor repairs. Ready for acceptance on the agreed date.
Strip-out, pipework, waterproofing, tiling and installation from a single company, with a test report — details under Plumbing.
Removal of the old kitchen, adjustment of the connections, installation of the new kitchen including splashback and appliances.
Parquet, tiles, skim coating and painting in one sequence — consistent throughout the property. Also available separately under Tiling & flooring and Painting.
Describe the scope — at the site visit we tell you whether and how we can take it on.
What every quote for complete renovation includes — at no extra cost.
Your project manager coordinates all trades in parallel rather than one after another. That saves weeks without rental income.
Fixed price after the site visit. Change orders only if you change the scope — and then in writing before the work is done.
Acceptance report and photo documentation for owners, property management or tenant billing.
Short answers. Everything else we clarify at the site visit.
It depends on the scope: painting and minor repairs are done in a few days, while a flat with a new bathroom and kitchen takes several weeks. For a vacant 3.5-room flat with painting, flooring and minor repairs, we typically allow one to two weeks. Either way, the date is set out in the contract.
Yes. For a series in the same building, we stagger the trades so that painters, floor layers and plumbers do not wait for each other. How many flats can run in parallel is something we clarify at the site visit — it depends on scope and dates.
We stop, document everything with photos and send you a change order with a price. Work only goes ahead once you have approved it.
Yes, from three hours of work. Our process is the same: site visit, fixed-price quote, contract with dates.
Images from projects in Zurich and German-speaking Switzerland. Every image can be opened.
The consultation is free. You get a confirmation straight away, and we call you back within one hour (Mon–Fri 08:00–18:00).