Bathroom renovation in Dübendorf.

Complete bathroom renovation in Dübendorf — in rented flats and in condominiums (Stockwerkeigentum), with a test report for the new pipes and a fixed handover date in the contract. Travel included in the fixed price.

Bathroom renovation Dübendorf — complete renovation from strip-out to acceptance

Three firm commitments.

One company

Strip-out, plumbing, waterproofing and tiling from the same company — no hand-over point where things get stuck.

With a test report

Pressure and leak test of the new pipes, photos of the waterproofing before it is closed — you receive both.

Fixed handover date

The date is in the contract, not in a verbal promise. 5-year warranty from acceptance.

Bathroom in a condominium flat.

Dübendorf keeps developing: in Hochbord, an industrial zone since 1931, a mixed-use neighbourhood with housing is emerging, including the Feldmann Park development with around 130 owner-occupied flats. Whether new or older — in a condominium (Stockwerkeigentum), the bathroom is a special case. You are free to fit out the inside of your flat as you wish; components that matter for the stability of the building, and pipes that also serve other flats, belong to the community of owners (Art. 712b of the Civil Code, ZGB). Before we quote, we therefore clarify where your bathroom pipes connect to the shared risers and which work affects the community. We record this in writing as a basis for your property manager. The quote separates labour and materials item by item; travel of about 20 minutes is included in the fixed price.

How a complete renovation runs.

Six steps, always in this order. If one is skipped, it only shows years later — usually as damp.

  1. 01

    Strip-out back to the shell

    Old fixtures, tiles and substructure come out; rubble is removed as we go.

  2. 02

    New water and waste pipes

    Laid and checked with a pressure and leak test. The report goes to you.

  3. 03

    Pre-wall installation

    WC, cistern and niches built into the wall — the plumbing disappears and you gain storage space.

  4. 04

    Bonded waterproofing

    Applied before tiling and photographed before it is covered. Without this step, a level-access shower is not watertight.

  5. 05

    Tiles and grout

    Floor and walls, large-format or small, according to your choice of materials.

  6. 06

    Installation and acceptance

    Taps, mirror, lighting, cleaning — handover with an acceptance report.

What it costs.

For a complete bathroom renovation in Dübendorf we expect CHF 8'500–19'000 for labour — Dismantling, new pipework, bonded waterproofing, wall and floor tiles, WC, washbasin, shower — large formats and bathtub at the upper end. Materials (tiles, fixtures, fittings) come on top, as you choose. Travel is included in the fixed price and is not a separate item.

  • On-site survey and advice
  • Binding quote, item by item
  • Waste and packaging from our work
  • Pressure and leak test with report (plumbing)
  • Site cleaning and broom-clean handover
  • 5-year warranty from acceptance

Bathrooms from our archive.

From our photo archive — every image can be opened.

Bathroom in green marble — Zurich
Plumbing

Bathroom in green marble

Zurich
Bathroom with walk-in shower — Reference project
Plumbing

Bathroom with walk-in shower

Reference project
Natural stone, built-in wall units — Zurich
Tiling & flooring

Natural stone, built-in wall units

Zurich

Building permit.

In Dübendorf, the city's Building Construction Department (Abteilung Hochbau, Usterstrasse 2, 8600 Dübendorf) is responsible; since 1 March 2025 the city has accepted building applications only electronically via the eBaugesucheZH platform. Under § 1 of the cantonal Building Procedures Ordinance (Bauverfahrensverordnung, BVV), bathroom, laundry and toilet installations as well as water and electrical connections that are not visible from outside normally need no building permit (Baubewilligung) in the building zone — nor does removing interior partition walls between living rooms. Changes of use and structural changes beyond that, for example to the facade or load-bearing walls, do require a permit (§ 309 PBG). The city recommends getting in touch early for preliminary questions; a reply to a preliminary enquiry (Voranfrage) can take up to three weeks. We clarify your case before work starts and confirm the outcome in writing. A bathroom that stays in the same place and needs no new pipe through the load-bearing structure is usually straightforward.

A completed bathroom.

Bathroom — green marble and brass

A watertight, fully documented bathroom in three to four weeks. The owner holds the test report and photos of the pipes taken before the walls were closed.

Frequently asked questions.

What we are asked most often before a bathroom renovation in Dübendorf.

How much does a bathroom renovation in Dübendorf cost?

Our guide price for a complete bathroom renovation is CHF 8'500 to 19'000 for labour, excl. VAT. Where your bathroom falls within this range depends mainly on how many pipes are replaced, how large the tiled area is and which tile format you choose — large format is at the upper end. Tiles, fixtures and fittings come on top as materials; travel is included.

Does a building application for the bathroom have to be submitted via eBaugesucheZH?

As a rule, no: bathroom, laundry and toilet installations as well as water and electrical connections that are not visible from outside normally need no permit in the building zone (§ 1 BVV). An application is needed, for example, for a change of use or for work on the facade or load-bearing walls (§ 309 PBG) — in Dübendorf, since 1 March 2025, only electronically. We clarify this with the Building Construction Department (Abteilung Hochbau) before work starts.

We own a condominium flat — what can we decide on our own?

You are free in the structural design of your own rooms, as long as you do not damage shared components, installations and facilities or impair their function (Art. 712a ZGB). Pipes that also serve other flats, and load-bearing components, are shared property (Art. 712b ZGB). After the survey, we show you in writing which work this affects.

How quickly will we receive a quote?

On working days we call you back within one hour (Mon–Fri 08:00–18:00). After the site visit with measurements taken by our chief engineer, you receive the fixed-price quote within 48 hours; the handover date then goes into the contract.

How long does a bathroom renovation take?

On the reference project (bathroom in green marble) it took three to four weeks from strip-out to acceptance. We give you the binding date after the survey on site; it then goes into the contract.

Can we use the bathroom during the work?

No. During a complete renovation the bathroom cannot be used from removal to installation. If the property has only one bathroom, we plan this with you in advance.

Who buys the tiles and fixtures?

As you prefer. We can source everything, or you supply the materials and we install them — either way, the labour is shown separately in the quote.

Do you also renovate several bathrooms in a series?

Yes. Same materials, same process, flat by flat — so the effort per bathroom stays predictable and the flats can be let again one after another.

Related:

What does it cost? Guide prices in 30 seconds.

Choose an area, choose a service, move the slider — you see the guide price for the labour straight away. Materials and VAT come on top; the fixed-price quote is binding.

Live calculator · 2026 price list
Area
Service
Guide price for Painting walls · 40 m² wall area
CHF 720 – 1'000

CHF 18–25 per m²

Two coats, covering included (paint as materials extra)

  • Labour only · materials extra · excl. VAT
  • Budget range — not a binding total price.

Unit prices for the labour from our 2026 price list (lower price segment), excl. VAT. The higher figure applies in difficult conditions. Materials, disposal of strip-out material, crane, scaffolding and permits come on top. The guide price does not replace a site visit.

Let's talk about your project.

The consultation is free. You get a confirmation straight away, and we call you back within one hour (Mon–Fri 08:00–18:00).