Floor-plan changes
Moving walls, combining rooms, opening up the kitchen — including a structural assessment and adjustment of the services.
Das Haus wird geladen
Changing floor plans, converting attics, fitting out commercial premises — with construction drawings, coordinated specialist planners and fixed dates for start and handover.

We clarify what requires a permit and bring in the structural engineer before the first wall comes down.
Floor plan, service routes and electrical plan are drawn before work starts and approved with you.
Strip-out, drywall, plumbing, electrical work (by a licensed electrical firm we coordinate), flooring and painting all run through your project manager.
Start, stages and handover are agreed in writing.
More: Plastering and drywall in Zurich · Renovation and remodelling in Zurich and throughout Switzerland · Kitchen renovation in Zurich
What we take on in remodelling & drywall — on its own or as part of a complete package.
Moving walls, combining rooms, opening up the kitchen — including a structural assessment and adjustment of the services.
Extending existing buildings in coordination with the architect, structural engineer and authorities.
Insulation, drywall, window connections and building services — the roof space becomes living or office space.
Office, practice, salon, shop: from shell to handover, outside your business hours if you wish.
Lightweight partition walls, wall linings, suspended ceilings with indirect lighting, sound insulation.
Describe the scope — at the site visit we tell you whether and how we can take it on.
What every quote for remodelling & drywall includes — at no extra cost.
You deal with your project manager, who coordinates planners, authorities and all trades.
Structure and services are clarified and drawn before work starts — not during execution.
Six rooms from planning to handover, including underfloor heating and construction drawings.
Short answers. Everything else we clarify at the site visit.
Floor-plan changes that do not affect the load-bearing structure often require no permit; extensions and changes of use do. We clarify whether a permit is needed before work starts and coordinate the application with the specialist planners.
An external structural engineer whom we bring in and coordinate. Their costs are shown separately in the quote.
From strip-out to handover, remodelling a flat usually takes several weeks to a few months, depending on the scope. The date is set out in the contract, the stages in the construction programme.
For commercial premises, yes — in stages, with dust protection walls and, by arrangement, work outside opening hours.
Images from projects in Zurich and German-speaking Switzerland. Every image can be opened.
The consultation is free. You get a confirmation straight away, and we call you back within one hour (Mon–Fri 08:00–18:00).