Tenant fit-out

Tenant fit-out for businesses, offices and shops

Remodelling and fit-out of office, practice, salon and retail space — in stages, outside opening hours and with an opening date written into the contract.

For businesses & shop fit-out — BauStern

Your reality.

Three problems we know from talking to business and shop owners.

Your business cannot stop

Every day you are closed is a day without revenue. The remodelling has to be planned around your opening hours.

The opening date is fixed

Advertising, staff and the start of the lease are already planned — the site has to fit around them, not the other way round.

Many trades, little time

Partition walls, floors, plumbing, electrical preparation, painting: all in a small space and in a short time.

What BauStern takes on.

Tenant fit-out from a single company

Strip-out, partition walls, floors, plumbing, painting and installation — coordinated by one site manager.

Work outside opening hours

Evening, night and weekend work by arrangement, with daily cleaning and dust protection.

Phased planning

Your business keeps running in one part while the other part is remodelled.

Handover on the opening date

Acceptance report, cleaned space, protective coverings removed — on the date set in the contract.

Three reasons.

Opening as planned

The date is written into the contract, and the construction programme is built around it.

Revenue keeps coming in

Working in stages and outside opening hours keeps your business open.

Reference: hair salon

Reception, arches, marble and brass — tenant fit-out of a retail unit.

Frequently asked questions.

What business and shop owners ask us before the first job.

Can you work at night or at weekends?

Yes, by arrangement and within local noise regulations. We schedule noisy work in the permitted time slots.

Do you also handle electrical work?

The preparation — chases, conduits, boxes — yes. The electrical installation itself is carried out by a licensed electrical firm that we coordinate.

How long does a tenant fit-out take?

A few weeks, depending on the area and the fit-out standard — for retail space, we plan backwards from the opening date. The date is written into the contract.

Do you work with our interior designer?

Yes. We build to their plans and contribute construction details before work starts.

Other solutions:

Let's talk about your project.

The consultation is free. You get a confirmation straight away, and we call you back within one hour (Mon–Fri 08:00–18:00).