Starting point
A hotel in full operation: rooms with worn floors and walls, plus an unused vaulted cellar. The goal: renew the rooms floor by floor and run the cellar as a bar.
Das Haus wird geladen

Series renovation of hotel rooms and conversion of a natural stone vault into a bar and lounge.
German-speaking Switzerland
Rooms bookable again stage by stage; the vaulted bar has opened.
A hotel in full operation: rooms with worn floors and walls, plus an unused vaulted cellar. The goal: renew the rooms floor by floor and run the cellar as a bar.
Rooms in series — the same materials, the same processes, closed one floor at a time. In the vault: bar counter, seating niches, flooring and lighting, with care for the natural stone fabric.

Complete fit-out of a flat, 47 m², 6 rooms — from planning to turnkey handover.
Read the case study →
Bathroom renovation with large-format natural stone, a walk-in shower and a recessed wall niche.
Read the case study →
Shop fit-out with a marble reception counter, arches and brass details.
Read the case study →The consultation is free. You get a confirmation straight away, and we call you back within one hour (Mon–Fri 08:00–18:00).